Solenoid-Driven Metering PumpPZiG Series¡Be sure to keep this User's Manual in a place where it will be easilyavailable for reference.¡If the PZi
9Installation• Insert hoses sufficiently and firmly tighten hose nuts to prevent hoses frombecoming disconnected. Do not tighten them with a tool usin
10InstallationElectrical Wiring¡Do not operate this pump with wet hands. Doing somight result in electric shock.¡Do not turn the power ON during elect
11InstallationA 4-pin/8-pin separation-type connector is used for the signal connections on thispump. The signal lead used is a multi-core round tough
12InstallationElectrical WiringConnection to a TACMINA Pulse Transmitting Flow Meter• Cable w/ 4-pin connectorBring leads 1 (red) and 3 (white) of the
13OperationOperation¡When handling liquid-end sections, be sure to wearprotective coverings (rubber gloves, mask, protec-tive goggles, chemical-resist
14OperationAir Release¡During air release, chemicals spray forcefully fromthe tip of the piping. Either release air using wateror other safe liquid, o
15OperationBefore changing the mode, stop pump operation and then press the MODE key.Setting the Discharge VolumeOperation FlowMultiplicationtimesPump
16OperationThe calibration procedure is as follows. The figures below are for a PZiG-1000.(1) Install the pump and pump to match the actual piping con
17Operation●Basic operationIn the manual mode, the discharge volume can be setby the following methods:• By changing the stroke spm (1 to 300 spm)• By
18OperationSetting Manual Mode (changing the ratio)Setting Manual Mode (changing the discharge volume)Setting the Discharge VolumeDisplay Operation Ex
1*1 The ambient temperaturerange is -10°C to 50°C duringtransportation and storage.Also, do not subject thispump to strong shock duringtransportation
19OperationIn the analog mode, analog signals from an externaldevice are received, and automatic operation is per-formed within the range 0 to 300 spm
20Operation●Proportional band (PB)With the proportionalband (PB), set theinverse number of theline's ramp.Example: When the PBis 100%Proportional
21Operation●Basic operation1Pulse signals from the outside are received, andautomatic operation is performed according the fre-quency-division ratio s
22Operation●Basic operation1Pulse signals from the outside are received, andautomatic operation is performed by the number ofstrokes corresponding to
23Operation●Basic operation1The start signal is received and the pump operatesfor the number of preset times. (batch processing)2The setting value can
24Operation●Basic operation1Intermittent operation by the preset ON and OFFtimes is repeated.* The ON/FF state during a start can be changed byparamet
25OperationKeys can be locked to protect setting values. The STOP/START key can be operated even when the key lock is active.(1) Set the mode that you
26MaintenanceMaintenance¡When handling liquid-end sections, be sure to wearprotective coverings (rubber gloves, mask, protec-tive goggles, chemical-re
27MaintenanceReplacing the DiaphragmWhen fixing the pump head using the head bolts,tighten the bolts in the order shown below a little ata time using
28Maintenance• Attach O-rings, ball stoppers and check balls making sure that they face the correct direction.• When removing and re-fitting in the up
2¡When a tightening valve is located on the discharge piping, and when there is a risk of blockage, be sure toinstall a relief valve on the piping imm
29MaintenanceHexagon head boltUnionnut2ndjointUnionjointO-ring*2ndjoint1st joint1st jointO-ring*Check ball*Check ball*O-ring*O-ring*O-ring*Unionnut2nd
30MaintenanceHose jointO-ring*Valve stopperCheck ball*Discharge sidelower jointO-ring*Pump headO-ring*Valve stopperCheck ball*Hose jointWasherSpringwa
31Setting ParametersFor defaults, see page 32.Setting ParametersParameter Setup FlowManualSTPP --- 01P --- 02P --- 03P --- **SET +SETSETSETHold down t
32Setting ParametersParameter ListSetting ParametersNo. Item Details ParameterDefaultExplanationP-01Internal pro-cessing0Used for internal processing.
33TroubleshootingTroubleshooting¡Do not operate this pump with wet hands. Doing so might result in electric shock.¡Make sure to turn OFF the power bef
34TroubleshootingDetails of Trouble Cause RemedySignals are not input accord-ing to preset division or multi-plication ratio.(during pulse signal inpu
35Specifications1Series namePZiG Series2Pump model 3Pump head materials4Diaphragm materials5Check ball6O-ring7Connection8Joint Specification9Applicabl
36SpecificationsOperating tem-perature rangeTransferrable viscosity (mPa·s)Self-priming height (m) Weight (kg)300Stroke length adjustment range (%)Dis
37Specifications¡4-pin connector I/O Signal SpecificationsCategoryStandardInputMax. response speed 125 Hz (duty 50%)Input resistance: approx. 2 kΩMax.
38Specifications Performance CurvesThe following performance curves are measurement examples obtained by measuring on test equipment at TACMINA.These
3When unpacking, please confirm the following items:(1) Is the enclosed product the same model you ordered?(2) Do the details on the pump nameplate ma
39Specifications Length of Discharge-side Pipingand Discharge VolumeThe graph below shows the relationship between pipinglength and discharge volume.
40Specifications External Dimensions (mm)PZiG-300/500/700/1000/1300-VTCE/VTCF-12 x 18PVC-W-150165E1703238D14170CBAAPZiG-300/500/700/1000/1300-VTCE/VTC
41Specifications External Dimensions (mm)PZiG-300/500/700/1000/1300-VTCF-VP20-V-BAPZiG-300/500/700/1000/1300-VTCF-FNPT3/4-V-3817032AB16515014294248124
42Specifications External Dimensions (mm)PZiG-300/500/700/1000/1300-VTCF-MNPT3/4-V-150165BA17038 3215415430832417014PZiG-300/500/700/1000/1300-F
43Specifications External Dimensions (mm)PZiG-300/500/700/1000/1300-FTCT-FNPT-1/2-W-16515014170DCABE 17038 32FABPZiG-300/500/700-FTCT-FNPT-1/2-W- 115
44SpecificationsConsumables and Spare Parts ConsumablesThe recommended replacement cycles are for cases where the pump is operated under constant cond
45If you are unsure about customer services (e.g. repair within the warranty period), please contact your supplying agent.Customer ServicesWarranty Wa
05-45_PZiG Series(2)English 06.8.4 9:39 AM y[W 46
Head Office:2-4-8 Minami-Semba, Chuo-ku, Osaka 542-0081 JapanTel. +81(0)6-6271-3974Fax. +81(0)6-6271-4677URL http://www.tacmina.comE-mail trade@tacmin
4ContentsExplanation of Product...5Names
5OutlineThe metering pump PZiG Series accurately feeds a fixed amount of liquid for a fixed period of time. Liquid is fed byaction of the check valve
6InstallationInstallation¡This pump is not designed to explosion-proof spec-ifications. It cannot be used in explosion-proofareas, and in explosive/ig
7InstallationThis section mainly describes hose connection type piping. Contact TACMINA separately for details of other types of piping.PipingRequests
8InstallationThe following examples show layouts for a hose connection type pump.Piping●Floor installation procedureThe following explains an example